Completing the test.......................................................................92
Two step residual overvoltage protection ROV2PTOV (59N)...........93
Loss of voltage check LOVPTUV (27)...............................................93
Testing frequency protection functions...................................................95
Underfrequency protection SAPTUF (81)..........................................95
Verifying the settings....................................................................95
Completing the test.......................................................................96
Overfrequency protection SAPTOF (81)...........................................96
Verifying the settings....................................................................96
Completing the test.......................................................................97
Rate-of-change frequency protection SAPFRC (81).........................97
Verifying the settings....................................................................97
Completing the test.......................................................................98
Testing secondary system supervision functions...................................98
Current circuit supervision CCSRDIF (87).........................................98
Fuse failure supervision SDDRFUF...................................................99
Checking that the binary inputs and outputs operate as
function ......................................................................................100
Measuring the operate value for the zero-sequence
function ......................................................................................101
Completing the test.....................................................................102
Testing control functions.......................................................................102
Synchrocheck, energizing check, and synchronizing SESRSYN
Testing the synchronizing function.............................................105
Testing the synchrocheck check................................................106
Testing the energizing check......................................................110
Testing the voltage selection......................................................111
Completing the test.....................................................................112
Autorecloser for 3-phase operation SMBRREC (79).......................112
Preparation of the verification ....................................................114
Table of contents
5
Commissioning Manual
Содержание Relion 650 Series REL650
Страница 1: ...Relion 650 series Line distance protection REL650 ANSI Commissioning Manual ...
Страница 2: ......
Страница 8: ......
Страница 22: ...14 ...
Страница 44: ...36 ...
Страница 52: ...44 ...
Страница 156: ...148 ...
Страница 166: ...158 ...
Страница 175: ...167 ...