Section 5 Testing IED operation..........................................................37
Preparing the IED to verify settings........................................................37
Activating test mode...............................................................................39
Preparing the connection to the test equipment.....................................39
Connecting the test equipment to the IED..............................................40
Releasing the function to be tested........................................................41
Verifying analog primary and secondary measurement.........................42
Testing protection functionality...............................................................43
Section 6 Testing functionality.............................................................45
Testing disturbance report......................................................................45
Identifying the function to test in the technical reference manual ..........45
Testing impedance protection functions.................................................46
Five zone distance protection, quadrilateral and mho
characteristic ZQMPDIS (21)............................................................46
Quadrilateral characteristics.........................................................46
Mho characteristics.......................................................................49
Measuring the operating limit of set values with shaped load
Phase selection with load encroachment, quadrilateral
characteristic FDPSPDIS (21)...........................................................52
Faulty phase identification with load encroachment FMPSPDIS
Completing the test.......................................................................57
Power swing detection ZMRPSB (68)...............................................57
Verifying the settings....................................................................58
Testing the power swing detection function ZMRPSB (68)..........59
Testing the
tR1 timer....................................................................59
Completing the test.......................................................................60
Automatic switch onto fault logic, voltage and current based
ZCVPSOF..........................................................................................60
Table of contents
2
Commissioning Manual
Содержание Relion 650 Series REL650
Страница 1: ...Relion 650 series Line distance protection REL650 ANSI Commissioning Manual ...
Страница 2: ......
Страница 8: ......
Страница 22: ...14 ...
Страница 44: ...36 ...
Страница 52: ...44 ...
Страница 156: ...148 ...
Страница 166: ...158 ...
Страница 175: ...167 ...