7.3. Change of consumables and chemicals
The change of consumables and chemicals have to be done by a Carl Zeiss servce engineer in
mandatory intervals.
The times scheduled are designed for the maximum equipment performance level:
1
There is no warranty on cathodes; cathode manufacturers do not guarantee any lifetime.
Interval
Component/Part
Every 6000 h
1
(filament on)
Gun (cathode)
1
As required or yearly
(and after cathode exchange)
Standard multihole aperture
Anode aperture
Extractor aperture
Anode aluminium seal
Copper seal at gun head
Yearly or as required
Pre-vacuum pump
Yearly
SE2 detector
In-lens detector
InlensDuo detector
As required
Ion source
With every ion source replacement
FIB apertures
Upgraded workstation
If used up
Precursors
Table 7.1: Time schedule
Summary of Contents for AURIGA Compact Crossbeam
Page 1: ...AURIGA Compact Crossbeam workstation Instruction Manual ...
Page 50: ...RM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP PK aÉëÅêáéíáçå ìëíçãÉê ëÉêîáÅÉ ...
Page 54: ...RQ çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP RK fåëí ää íáçå ...
Page 150: ...NRM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP UK qêçìÄäÉëÜççíáåÖ mçïÉê ÅáêÅìáí ...
Page 156: ...NRS çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP NNK ÄÄêÉîá íáçåë ...
Page 160: ...NSM çÑ NSQ fåëíêìÅíáçå j åì ä ìêáÖ çãé Åí ÉåMP NPK aÉÅä ê íáçå çÑ ÅçåÑçêãáíó ...