![YOKOGAWA AE100D Instruction Manual Download Page 208](http://html.mh-extra.com/html/yokogawa/ae100d/ae100d_instruction-manual_911083208.webp)
IM 1F6A0-01E
5-21
5. BASIC OPERATING PROCEDURES
1 Device setup
2 PV [cr]
3 AO1 [cr]
4 Flow Span [cr]
5 Mode
4 Detailed setup
1 Characterize meter
2 PV unit
Online Menu
to be continued to next page
1 Nominal size
2 Body type
3 Sensor type
4 K-factor setup
5 Detector No. [r&w]
15mm [r&w sel]
25mm
40mm
50mm
80mm
100mm
150mm
200mm
250mm
300mm
400mm
Standatd [r&w sel]
High pressure
Low flow unit(1)
Low flow unit(2)
1 K-factor unit
2 K-factor[r&w]
p/l [r&w sel]
p/gal
p/Impgal
1 Temp unit (*5)
2 Process temp[r&w]
3 Base temp[r&w]
4 Pressure unit (*7)
5 Process pressure[r&w]
6 Base pressure[r&w]
7 Deviation[r&w]
8 STD/Normal unit (*4)
9 Time unit (*1)
10 End
Standatd [r&w sel]
High temperature
Low temperature
1 Fluid[#]
2 Special unit[#]
Liquid:Volume
Gas/Steam:Volume
Liquid:Mass
Gas/Steam:Mass
Gas:STD/Normal
1 Volumetric unit (*2)
2 Time unit (*1)
3 End
1 Density unit (*6)
2 Process density[r&w]
3 Mass unit (*3)
4 Time unit (*1)
5 End
No
Yes
1 Base unit[r]
2 User's unit[r&w]
3 Conversion factor[r&w]
4 End
<*1>
F050606–03.EPS