4 - 31
ENG
4. Install:
●
Nut (clutch boss)
1
NOTE:
Use the clutch holding tool
2
to hold the clutch
boss.
È
For USA and CDN
É
Except for USA and CDN
Clutch holding tool:
YM-91042/90890-04086
5PA40870
T
R
.
.
70 Nm (7.0 m · kg, 50 ft · lb)
È
É
5PA40880
5. Install:
●
Friction plate 1
1
●
Clutch plate
2
●
Friction plate 2
3
NOTE:
●
Install the clutch plates and friction plates
alternately on the clutch boss, starting with a
friction plate and ending with a friction plate.
●
Use the friction plates 1 for the first and final
while paying attention to the difference in
surface pattern.
●
Apply the transmission oil on the friction
plates and clutch plates.
5PA40890
5PA40900
6. Install:
●
Push rod 2
1
●
Ball
2
●
Push rod 1
3
NOTE:
Apply the transmission oil on the push rod 1, 2
and ball.
5PA40910
CLUTCH AND PRIMARY DRIVEN GEAR
Summary of Contents for YZ85( P) /LC
Page 63: ...GEN INFO MEMO ...
Page 113: ...2 16 SPEC MEMO ...
Page 457: ... ELEC MEMO ...
Page 506: ......
Page 507: ......