3-3
ENG
CONTROL BOX
(FOR AUSTRALIA)
1
2
3
4
7
5
11
6
9
8
10
Order
Job name
Q’ty
Remarks
Control panel disassembly
Remove the parts in the order listed
below.
1
Oil warning light (red, LED)
1
2
AC pilot light (green)
1
3
Overload warning light (red, LED)
1
4
Economy control switch
1
5
Engine switch
1
6
Twin Tech (parallel running terminal)
2
7
AC receptacle
1
8
DC protector
1
9
DC receptacle
1
10
Ground (earth) terminal
1
11
Control panel
1
For installation, reverse the removal
procedure.
7DK40-03_a 6/12/09 5:45 PM Page 5
Summary of Contents for EF2000iS - Inverter Generator
Page 2: ...7DK40 Cover 4 6 09 9 18 AM Page 2 ...
Page 13: ...7DK40 00 6 15 09 2 54 PM Page 11 ...
Page 17: ...7DK40 00 6 15 09 2 54 PM Page 15 ...
Page 21: ...7DK40 00 6 15 09 2 54 PM Page 19 ...
Page 223: ...ELEC 7DK40 05 6 12 09 6 01 PM Page 41 ...
Page 233: ...ELEC 7DK40 05 6 12 09 6 01 PM Page 51 ...
Page 255: ...TRBL 7DK40 06 6 15 09 10 30 AM Page 22 ...
Page 310: ...7DK40 07 6 15 09 3 01 PM Page 55 ...
Page 311: ...7DK40 Cover 4 6 09 9 18 AM Page 2 ...