7-15
SPEC
WIRE ROUTING DIAGRAM
(FOR KOREA)
G/Y
Or
B
R
Br
R
B
B
B
R
Br
W
G/Y
(3)
1
Oil warning light (Red)
2
AC pilot light (Green)
3
Overload warning light (Red)
4
Economy control switch
(Black)
5
Engine switch (Red)
6
Twin Tech (parallel running ter-
minal)
7
DC receptacle
8
AC receptacle
9
DC protector (breaker)
0
Ground (earth) terminal
q
Sub-wire harness
w
Wire harness
e
DC protector lead wire
r
Control panel
å
To control unit
∫
To ground (earth) terminal
ç
To rectifier
∂
To CDI unit/ignition coil
´
To AC coil
ƒ
To DC coil
©
Secure the wire harness and
sub-wire harness.
˙
Identification tape
ˆ
Caution for assembly direction
∆
Within 3 mm (0.12 in)
COLOR CODE
B ........Black
Br .......Brown
G........Green
Gy ......Gray
L.........Blue
O........Orange
R ........Red
W .......White
Y ........Yellow
B/W....Black/White
G/Y ....Green/Yellow
R/W....Red/White
7DK40-07 6/15/09 3:01 PM Page 39
Summary of Contents for EF2000iS - Inverter Generator
Page 2: ...7DK40 Cover 4 6 09 9 18 AM Page 2 ...
Page 13: ...7DK40 00 6 15 09 2 54 PM Page 11 ...
Page 17: ...7DK40 00 6 15 09 2 54 PM Page 15 ...
Page 21: ...7DK40 00 6 15 09 2 54 PM Page 19 ...
Page 223: ...ELEC 7DK40 05 6 12 09 6 01 PM Page 41 ...
Page 233: ...ELEC 7DK40 05 6 12 09 6 01 PM Page 51 ...
Page 255: ...TRBL 7DK40 06 6 15 09 10 30 AM Page 22 ...
Page 310: ...7DK40 07 6 15 09 3 01 PM Page 55 ...
Page 311: ...7DK40 Cover 4 6 09 9 18 AM Page 2 ...