09/03
4-172
DC 3535/2240/1632, WC M24
ADJ 9.9
Initial issue
Repairs and Adjustments
ADJ 9.9 IOT Registration Series (dC129)
Purpose
The purpose is to adjust the position of the printed image on the page. This is done by chang-
ing the value in the appropriate NVM location in dC129. This controls where the ROS writes
the image.
Introduction
This series consists of 4 procedures:
Lead Edge Registration (All Trays)
Side Edge Registration (Trays 1-5)
Duplex (Side 2) Registration
Lead Edge Registration for Tray 5
All procedures must be checked.
Lead Edge Registration (All Trays)
Purpose
To correctly set the lead edge of the image in relation to the edge of the paper. There is one
lead edge setting for Trays 1 - 5. The test pattern will print from Tray 1.
Check
1.
Connect the PWS to the machine and enter Diagnostic Mode (refer to
Entering Diagnostic
Mode using the PWS
). Select dC129 from the
DC Quick
menu.
2.
Load Tray 1 with the largest paper used by the customer. Use 11x17/A3 if available.
3.
Select
ALL
in the
Lead Edge
column.
4.
Press the
Start
button on the screen. As the prints are made, mark each to indicate the
lead edge (flip the sheets from face down to face up without rotating).
5.
Take the third print and measure from the lead edge to point ‘A’ on
Figure 1
(the intersec-
tion of the 7th line from the left edge and the first line from the lead edge).
6.
If the measured value is not 21.6mm
±
0.5, perform the Adjustment.
Figure 1 Measurement points
Adjustment
1.
Use the Right and Left Arrow buttons to increase or decrease the amount of lead edge
spacing. Use the right arrow to increase the spacing (moves the grid pattern to the left).
Each click moves the image 0.25mm. The cumulative amount of shift is indicated in the
Lead Reg.
box.
2.
After adjusting the registration, click
Set Adjust Value
.
NOTE: Changes made to the NVM for LE registration are not implemented unless the machine
exits Diagnostic Mode.
3.
Go to the
Service Exit
tab and select
Temporary Closeout
.
4.
After the machine reboots and is ready to copy, reconnect the PWS.
5.
Repeat the check/adjustment until the specifications are met.
6.
Select
Save [LR]
to save the new NVM settings.
7.
Proceed to
Side Edge Registration for Paper Trays 1 - 5
.
Summary of Contents for DocuColor 2240
Page 3: ...09 03 2 DC 3535 2240 1632 WC M24 Initial issue Introduction...
Page 8: ...09 03 vii DC 3535 2240 1632 WC M24 Introduction Initial issue Translated Warnings...
Page 23: ...09 03 xxii DC 3535 2240 1632 WC M24 Initial issue Introduction...
Page 25: ...09 03 1 2 DC 3535 2240 1632 WC M24 Initial issue Service Call Procedures...
Page 45: ...09 03 2 12 DC 3535 2240 1632 WC M24 Initial issue Status Indicator RAPs...
Page 51: ...09 03 2 18 DC 3535 2240 1632 WC M24 1 306 Initial issue Status Indicator RAPs...
Page 91: ...09 03 2 58 DC 3535 2240 1632 WC M24 3 986 Initial issue Status Indicator RAPs...
Page 113: ...09 03 2 80 DC 3535 2240 1632 WC M24 4 908 Initial issue Status Indicator RAPs...
Page 147: ...09 03 2 114 DC 3535 2240 1632 WC M24 6 391 Initial issue Status Indicator RAPs...
Page 189: ...09 03 2 156 DC 3535 2240 1632 WC M24 7 960 7 969 Initial issue Status Indicator RAPs...
Page 209: ...09 03 2 176 DC 3535 2240 1632 WC M24 8 631 8 900 Initial issue Status Indicator RAPs...
Page 251: ...09 03 2 218 DC 3535 2240 1632 WC M24 9 932 9 933 Initial issue Status Indicator RAPs...
Page 357: ...09 03 2 324 DC 3535 2240 1632 WC M24 15 790 Initial issue Status Indicator RAPs...
Page 417: ...09 03 2 384 DC 3535 2240 1632 WC M24 16 981 16 982 Initial issue Status Indicator RAPs...
Page 495: ...09 03 2 462 DC 3535 2240 1632 WC M24 20 798 20 799 Initial issue Status Indicator RAPs...
Page 497: ...09 03 2 464 DC 3535 2240 1632 WC M24 021 360 Initial issue Status Indicator RAPs...
Page 721: ...09 03 2 688 DC 3535 2240 1632 WC M24 116 900 Initial issue Status Indicator RAPs...
Page 727: ...09 03 2 694 DC 3535 2240 1632 WC M24 121 350 Initial issue Status Indicator RAPs...
Page 729: ...09 03 2 696 DC 3535 2240 1632 WC M24 202 399 Initial issue Status Indicator RAPs...
Page 745: ...09 03 3 2 DC 3535 2240 1632 WC M24 Initial issue Image Quality...
Page 783: ...09 03 3 40 DC 3535 2240 1632 WC M24 IBT Cleaner Streak Initial issue Image Quality...
Page 805: ...09 03 4 22 DC 3535 2240 1632 WC M24 REP 4 4 Initial issue Repairs and Adjustments...
Page 947: ...09 03 4 164 DC 3535 2240 1632 WC M24 ADJ 6 1 Initial issue Repairs and Adjustments...
Page 971: ...09 03 4 188 DC 3535 2240 1632 WC M24 ADJ 9 15 Initial issue Repairs and Adjustments...
Page 973: ...09 03 4 190 DC 3535 2240 1632 WC M24 ADJ 12 1 Initial issue Repairs and Adjustments...
Page 1093: ...09 03 6 2 DC 3535 2240 1632 WC M24 Initial issue General Procedures and Information...
Page 1239: ...09 03 7 2 DC 3535 2240 1632 WC M24 Initial issue Wiring Data...
Page 1283: ...09 03 7 46 DC 3535 2240 1632 WC M24 Plug Jack Locations Initial issue Wiring Data...
Page 1285: ...09 03 7 48 DC 3535 2240 1632 WC M24 AC Wirenets Initial issue Wiring Data Figure 2 ACN Wirenet...
Page 1477: ...09 03 9 2 DC 3535 2240 1632 WC M24 Initial issue Installation...
Page 1489: ...09 03 9 14 DC 3535 2240 1632 WC M24 Fax Kit Installation Initial issue Installation...