
3 Maintenance Procedures
140
September 26, 2013, 715004208 Rev. A
15. Prime the ISM (see
16. Perform the ISM leak test (see the ACQUITY online Help).
If the leak test results are not satisfactory, pressurize the head plunger seals
to properly seat them.
To pressurize the seals:
Run the ISM at 96,527 kPa (965 bar, 14,000 psi) for a half-hour, or run
the leak test until results are satisfactory.
Cleaning the instrument’s exterior
Clean surfaces of the solvent manager using only a clean, soft, lint-free paper
or clean cloth dampened with water.
Warning:
To avoid electric shock, observe these precautions:
• Disconnect the device or instrument from the electrical supply.
• When cleaning the surface of a device or instrument, apply water to a
cloth, and then wipe the unit. Do not spray or otherwise directly
apply water to any device surface.
Warning:
To avoid personal injury, use eye and hand protection during
the cleaning process.