Proceed with the injector seal test.
Dry the injector outlet with a blast of compressed
air. Activate the fuel pump. Wait for one minute,
making sure there are no leaks coming from the
injector. Slight oozing is normal.
Value limit = 1 drop per minute
HT coil
1. Battery
2. Fuse No. 1
3. Fuse no. 4
4. Ignition switch
5. Fuse no. 3
6. CDI control unit
7. Coil
The combined ignition/injection system is a high-efficiency induction system.
The control unit manages two significant parameters:
- Ignition advance
Injection
Vespa Primavera125 - 150 i.e. 3Valvole (2013)
INJEC - 200
Summary of Contents for 150
Page 1: ...SERVICE STATION MANUAL 1Q000118 EN Vespa Primavera125 150 i e 3Valvole 2013 ...
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 27: ...INDEX OF TOPICS TOOLING TOOL ...
Page 37: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 51: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 55: ...Vespa Primavera125 150 i e 3Valvole 2013 Troubleshooting TROUBL 55 ...
Page 56: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 117: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 123: ...INDEX OF TOPICS ENGINE ENG ...
Page 182: ...INDEX OF TOPICS INJECTION INJEC ...
Page 203: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 222: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 229: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 244: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 249: ...Transmission 10 53 124 136 Turn indicators 79 Tyres 11 V Vehicle 8 118 119 ...