Air duct
- Remove the plastic cover.
- Unscrew the two screws indicated and remove
the duct.
Removing the driven pulley shaft bearing
- Remove the Seeger ring.
CAUTION
PLACE THE COVER ON A SURFACE, REMOVING OR EX-
CLUDING THE ALIGNMENT DOWELS.
- Support the transmission cover adequately.
- Using appropriate tools, remove the bearing.
Specific tooling
020376Y
Adapter handle
020357Y
32 x 35 mm adaptor
020412Y
15 mm guide
Vespa Primavera125 - 150 i.e. 3Valvole (2013)
Engine
ENG - 125
Summary of Contents for 150
Page 1: ...SERVICE STATION MANUAL 1Q000118 EN Vespa Primavera125 150 i e 3Valvole 2013 ...
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR ...
Page 27: ...INDEX OF TOPICS TOOLING TOOL ...
Page 37: ...INDEX OF TOPICS MAINTENANCE MAIN ...
Page 51: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL ...
Page 55: ...Vespa Primavera125 150 i e 3Valvole 2013 Troubleshooting TROUBL 55 ...
Page 56: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS ...
Page 117: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE ...
Page 123: ...INDEX OF TOPICS ENGINE ENG ...
Page 182: ...INDEX OF TOPICS INJECTION INJEC ...
Page 203: ...INDEX OF TOPICS SUSPENSIONS SUSP ...
Page 222: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS ...
Page 229: ...INDEX OF TOPICS CHASSIS CHAS ...
Page 244: ...INDEX OF TOPICS PRE DELIVERY PRE DE ...
Page 249: ...Transmission 10 53 124 136 Turn indicators 79 Tyres 11 V Vehicle 8 118 119 ...