(2) Not using a flange ring (setting a left flange to the left side)
(1) Make a mark on the position to fix a flange
with a felt pen or something similar.
(2) Screw-in yarn beam flange 2 from the direction
of "A" until the flange's inside becomes aligned
with the mark.
For making the screwing-in job easier, apply
grease or oil to the threaded section.
(3) Set yarn beam gear 4 onto yarn beam 1 and turn
yarn beam gear 4 so that the holes (eight large
holes) provided in yarn gear 4 become aligned
with those in yarn beam 1.
Turn yarn beam flange 2 until the bolt holes
(three small holes) on yarn beam gear 4 become
aligned with those in yarn beam flange 2.
(4) Tighten yarn beam 1 and yarn beam gear 4 with
eight bolt 8. Then, align the bolt holes between
yarn beam flange 2 and yarn beam gear 4, and
tighten three bolt 7 (82101-10045 or 82101-
10055) evenly and sequentially.
M1. Preparation for Setting
4