Contents
[2.1] Preparation of gland beam
[2.2] Preparation of pile beam
[3] How to Run the Warps and Woven Fabric Through
[4] How to Remove/Reinstall the P-tension Shaft forEasier New Fabric Weaving
[1] Dobby Shedding Specifications
[1.1] Setting the Heald Frame Heightand Shed Size
[2] Electronic Shedding Specifications
[2.1] Setting the Heald Frame Height and Shedding Amount
[3] Jacquard Shedding Specifications
[3.1] Height of Top Rail Bracket
[1] Longitudinal Position of the Temple
[2] Crosswise Position of the Temple
[2.1] Left-hand side of the loom
[2.2] Right-hand side of the loom
[3] Vertical Position of the Temple
[4] Standard Setting of the Temple Ring
[5] Vertical Position of the Temple Cover
[6] Adjustment of Fell Plate Position
[7] Periodic Maintenance of Temple Base
[1] Leno Weave with Two Clockers
[1.2] How to Run the Selvage Yarns
[1.3] Yarns for Leno Weave SelvagingMotion
[2.1] Installation, Adjustment, andPreparatory Operation
[2] Outline of Let-off Control
[3] Adjustment of Easing Roller
[4] Adjustment of Electronic Terry Motion Type Let-off Pile Beam