[5] Assembly of Pile tenser shaft
In case of remove the Pile tenser shaft, assembly as
followings when you change the cloth.
(1) Fit tightly the Pile tenser shaft to load cell shaft 2.
(2) Assembly to face up the slit part of coupling 3 and
the top of bolt 4 to machine back side.
Tighten the bolt 4 with tightening torque 34 to 42 N
・
m ( Target to 40 N
・
m )
※
Tension can not be detected if the top of bolt 5
touches to support 5.
(3) Coupling 3 must fit tightly to the Stop ring.
M5. Pile Let-Off
29