[1]
Components of the let-off / take-up controller
1)
.
LETOFF1(Ground let-off, take-up)
2. DIP switch
3. Servo amplifier
4.
Heat sink
5.
Connector (CN1)
DC power line
6.
Connector (CN2)
Signal line in the control box
7.
Connector (CN3)
Load cell signal line
8.
Connector (CN4)
Communication line
9.
Connector (CN5)
LETOFF 1 resolver cable line
10. Connector (CN7)
For inspection (normally not used)
11. Connector (CN9)
AC 200 V power line
12. Connector (CN10)
LETOFF 1 servo motor output line
13. Connector (CN11)
Take-up resolver cable line
14. Connector (CN12)
Take-up servomotor output line
15. DIP switch (SW1)
For setting LETOFF 1 servomotor type and loom
specification
16. DIP switch (SW2)
For setting take-up servomotor type and loom
specification
17. DIP switch (SW3)
For setting LETOFF 1 and take-up specifications
E3. Electric Components / Let-off Motions for A Towel Loom
60