ACCQPrep HP125
Section 2 Installation
2-3
Figure 2-3 Pump compartment with electrical connection
shown
4. When the pump assembly is most of the way in the pump
compartment, connect the electrical connections on each
side of the pump. First, connect the black connection on the
left side. Ensure the tab on top of the connector is facing up
before pushing it into the mating connector (Figure 2-4).
Figure 2-4 Black connection with tab facing up
Then, connect the white connection on the right side. Ensure the
tab on top of the connector is facing up before pushing it into the
mating connector (Figure 2-5).
Figure 2-5 White connection with tab facing up
Summary of Contents for ACCQPrep HP125
Page 2: ......
Page 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Page 10: ...ACCQPrep HP125 Table of Contents 4 ...
Page 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Page 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Page 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Page 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Page 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Page 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Page 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Page 136: ...A 8 This page is intentionally left blank ...
Page 138: ......
Page 140: ......
Page 142: ......