ACCQPrep HP125
Section 6 Maintenance
6-19
3. Slide the new peristaltic tubing with the thicker tubing
towards the AutoSampler (Figure 6-28).
Figure 6-28 Attaching the new tubing
4. Replace the outer band of the peristaltic pump (Figure
6-29).
Figure 6-29 Replace the outer band
6.7 ELSD Maintenance
Periodic cleaning of the spray chamber will keep the
ACCQPrep operating at maximum performance. Use the
following steps if spray chamber cleaning is recommended.
6.7.1 Cleaning the ELSD
Detector
1. From the run screen select the M
ETHOD
E
DITOR
.
2. In the Peak detection window, select the ELS D
ETECTOR
radio button then select D
ETAILS
.
3. Set the spray chamber temperature to
40°C
.
4. Exit the Edit Method screen and accept the changes, then
allow approximately 5 minutes for the chamber to reach
the set temperature.
Summary of Contents for ACCQPrep HP125
Page 2: ......
Page 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Page 10: ...ACCQPrep HP125 Table of Contents 4 ...
Page 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Page 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Page 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Page 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Page 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Page 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Page 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Page 136: ...A 8 This page is intentionally left blank ...
Page 138: ......
Page 140: ......
Page 142: ......