ACCQPrep HP125
Section 2 Installation
2-20
Figure 2-32 Column Mounting Parts
To install a column onto the ACCQ
Prep
:
1. Select the proper sized column mount and simply slip the
mount into one of the two column mounting tracks on the
side of the ACCQ
Prep
(Figure 2-33).
Figure 2-33 Column track on the ACCQPrep
2. Remove the union connecting the column fluid supply line
to the column effluent line.
3. Connect the line from the injection valve to the inlet of the
column and connect the remaining tubing to the
column outlet (Figure 2-34).
Summary of Contents for ACCQPrep HP125
Page 2: ......
Page 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Page 10: ...ACCQPrep HP125 Table of Contents 4 ...
Page 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Page 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Page 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Page 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Page 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Page 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Page 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Page 136: ...A 8 This page is intentionally left blank ...
Page 138: ......
Page 140: ......
Page 142: ......