ACCQPrep HP125
Section 2 Installation
2-18
2. Turn O
N
the power to the ACCQ
Prep
. A red light on the
AutoSampler will light up, the arm will move to the H
OME
position, and then the light will turn blue (Figure 2-29).
Figure 2-29 Power switch for the ACCQPrep
Prime AutoSampler Wash
Station
1. Ensure the wash station supply line is placed into a suit-
able solvent (typically the strong chromatographic solvent)
and the waste line is routed to a suitable container.
2. Go to T
OOLS
|A
UTOMATION
M
ANUAL
C
ONTROL
, and select
the S
TART
W
ASH
button (Figure 2-30).
Figure 2-30 Screen of Start Wash button
3. Ensure the wash solvent is pumped into the center portion
of the wash station and when full, the fluid drains into the
overflow drain (Figure 2-31).
Summary of Contents for ACCQPrep HP125
Page 2: ......
Page 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Page 10: ...ACCQPrep HP125 Table of Contents 4 ...
Page 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Page 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Page 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Page 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Page 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Page 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Page 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Page 136: ...A 8 This page is intentionally left blank ...
Page 138: ......
Page 140: ......
Page 142: ......