ACCQPrep HP125
Section 2 Installation
2-5
3. Connect the
shorter
FEP inlet solvent line to the left side
pump’s PEEK tee. Slide the open side of the wrench
(included) over the tubing and FEP fitting and make small
turns as to not bend the tubing (Figure 2-8).
4. Connect the
longer
FEP inlet solvent line to the right side
pump’s PEEK tee. Slide the open side of the wrench
(included) over the tubing and FEP fitting and make small
turns as to not bend the tubing (Figure 2-8).
Figure 2-8 Wrench used to tighten the FEP inlet line
5. Once complete, install the faceplate onto the unit by snap-
ping the side mounted connectors into place.
2.2.3 Fluid Line Installation
Note
The solvent lines are installed at the factory and include labels
identifying the lines A1, A2, and A3 for the A solvents and line
B1, B2, and B3 for the B solvents when using the Solvent
Selector Valve Module.
1. Remove the two screws that secure the solvent lines for
shipment.
2. Place the solvent lines in the desired containers.
Summary of Contents for ACCQPrep HP125
Page 2: ......
Page 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Page 10: ...ACCQPrep HP125 Table of Contents 4 ...
Page 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Page 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Page 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Page 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Page 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Page 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Page 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Page 136: ...A 8 This page is intentionally left blank ...
Page 138: ......
Page 140: ......
Page 142: ......