ACCQPrep HP125
Section 6 Maintenance
6-20
Figure 6-30 ELSD Detection Options screens
5. Lift the p-trap drain tubing up to approximately case top
level. Using a wash bottle, syringe, or suitable measuring
device, slowly fill the drain line with up to 40 mL of ace-
tone. Lift the end of the tubing as needed to transfer most
of the liquid into the spray chamber. Make sure the fluid
level in the tubing doesn’t exceed the level of the instru-
ment case top. If the tubing is raised too fast, fluid may
flow out the top of the vent tube causing a spill. Hold the
tubing up for at least 1 minute after the fluid has been
transferred to the spray chamber.
Figure 6-31 Line filled with 40 ml of acetone
Summary of Contents for ACCQPrep HP125
Page 2: ......
Page 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Page 10: ...ACCQPrep HP125 Table of Contents 4 ...
Page 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Page 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Page 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Page 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Page 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Page 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Page 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Page 136: ...A 8 This page is intentionally left blank ...
Page 138: ......
Page 140: ......
Page 142: ......