ACCQPrep HP125
Section 2 Installation
2-11
Figure 2-16 Z-Drive mounted on the Y-axis carriage
3. Remove the two screws from the Y axis carriage. Slide the
Z-Drive onto the arm until the two holes align with the
matching holes in the Y-axis carriage.
4. Using the two plastic thumbscrews, secure the Z-Drive to
the carriage and finger tighten (Figure 2-17).
Figure 2-17 Z-Drive secured to the Y-axis carriage
5. Rotate the Z-Drive rotor back and forth to ensure that the
Z-Drive moved up and down freely (Figure 2-18).
Note
If the rotor does not move freely, check that the other cables
are not interfering with the movement of the green probe cable.
Summary of Contents for ACCQPrep HP125
Page 2: ......
Page 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Page 10: ...ACCQPrep HP125 Table of Contents 4 ...
Page 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Page 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Page 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Page 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Page 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Page 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Page 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Page 136: ...A 8 This page is intentionally left blank ...
Page 138: ......
Page 140: ......
Page 142: ......