ACCQPrep HP125
Section 2 Installation
2-6
2.2.4 ACCQPrep Equipped
with Optional ELSD
Note
Teledyne ISCO recommends >99% pure nitrogen from a
source that can deliver 2.5 SLPM at 60 to 70 psi.
Figure 2-9 Location of ELSD gas port (Nitrogen input line
circled)
The ACCQPrep ELSD system has several additional connections.
1. Install the ELSD P-trap vent assembly found in the acces-
sory package (PN 3-250004) by placing the short tube into
the port on the rear panel, orienting the vent as shown and
tightening the fitting nut finger tight plus a small amount
more with a wrench
(Figure 2-10)
.
Figure 2-10 Back of ACCQprep with optional ELSD
Summary of Contents for ACCQPrep HP125
Page 2: ......
Page 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Page 10: ...ACCQPrep HP125 Table of Contents 4 ...
Page 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Page 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Page 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Page 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Page 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Page 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Page 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Page 136: ...A 8 This page is intentionally left blank ...
Page 138: ......
Page 140: ......
Page 142: ......