ACCQPrep HP125
Section 2 Installation
2-24
Table 2-1 Installation Qualification Checklist
Step
Section
Description
Installer
Initials
Operator
Initials
1
Unpacking the unit
2
Instrument location
3
Connect power
4
Install AutoSampler (if applicable)
5
Set up solvent lines
6
Set up waste lines
7
ELSD/PurIon connections and gas supply (if
applicable)
8
Connect and route drain lines
9
Position the system
10
Installation of the collection tube racks
11
External detector (optional)
12
Turn on the power
13
Configure the system
14
Prime the solvent lines
15
Prime AutoSampler wash station (if installed)
16
System verification
Certification of Section 2 Completion
Installer Name (print):
Installer Signature:
Date:
Operator Name (print):
Operator Signature:
Date:
Comments:
Summary of Contents for ACCQPrep HP125
Page 2: ......
Page 6: ...ACCQPrep HP125 Installation and Operation Guide Safety Warnings 6 ...
Page 10: ...ACCQPrep HP125 Table of Contents 4 ...
Page 16: ...ACCQPrep HP125 Section 1 Introduction 1 6 ...
Page 100: ...ACCQPrep HP125 Section 5 PeakTrak 5 36 ...
Page 128: ...ACCQPrep HP125 Section 6 Maintenance 6 28 ...
Page 130: ...ACCQPrep HP125 Appendix A A 2 This page is intentionally left blank ...
Page 132: ...ACCQPrep HP125 Appendix A A 4 This page is intentionally left blank ...
Page 134: ...ACCQPrep HP125 Appendix A A 6 This page is intentionally left blank ...
Page 135: ...A 7 Appendix A ACCQPrep HP125 This page is intentionally left blank ...
Page 136: ...A 8 This page is intentionally left blank ...
Page 138: ......
Page 140: ......
Page 142: ......