5C-9 Clutch:
13) After installed pressure plate, adjust the clutch push
piece. Refer to “Clutch Cable Play Inspection and
Adjustment in Section 0B (Page 0B-17)”.
14) Apply a light coat of bond to the clutch cover gasket
mating surface as shown in the figure.
: Sealant 99000–31140 (SUZUKI Bond
1207B or equivalent)
15) Install the dowel pins and gasket (20).
CAUTION
!
Use a new gasket to prevent oil leakage.
16) Fit new gasket washer to the bolts (21).
CAUTION
!
Use the gasket washers to prevent oil
leakage.
17) Install the clutch cover and tighten the clutch cover
bolts.
18) Pour engine oil. Refer to “Engine Oil and Filter
Replacement in Section 0B (Page 0B-11)”.
Primary Driven Gear Removal and Installation
B822H15306019
Removal
1) Remove the clutch component parts (1). Refer to
2) Hold the primary driven gear (2) with the special tool
and remove the primary driven gear bolt.
Special tool
(A): 09930–44541 (Rotor holder)
3) Remove the primary driven gear.
I822H1530023-01
20
I822H1530030-02
21
21
I822H1530031-03
1
I822H1530037-01
(A)
2
I822H1530038-01
Summary of Contents for VLR1800
Page 4: ......
Page 64: ...0C 12 Service Data...
Page 456: ...2D 22 Wheels and Tires...
Page 489: ...Drive Chain Drive Train Drive Shaft 3A 31 09951 17010 Bearing installer Page 3A 19...
Page 490: ...3A 32 Drive Chain Drive Train Drive Shaft...
Page 580: ...6B 11 Steering Handlebar...
Page 623: ...Prepared by January 2008 Part No 99500 39360 01E Printed in Japan 624...