![background image](http://html.mh-extra.com/html/suzuki/2009-lt-a750xk9/2009-lt-a750xk9_service-manual_1408818686.webp)
Power Assisted Steering System: 6C-40
2
1) Connect the combination meter coupler and speed
sensor coupler.
2) Turn the ignition switch ON.
3) Measure the voltage between the Bl/B wire “A” and
ground.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Voltage (
)
Vehicle speed signal voltage
5.0 V
Is voltage OK?
Go to step 3.
Bl/B wire shorted to
ground.
3
1) Remove the engine side cover. Refer to “Rear Side
Exterior Parts Removal and Installation in Section 9D in
related manual”.
2) Inspect the speed sensor. Refer to “Speed Sensor
Inspection in Section 9C in related manual”.
Is speed sensor OK?
Replace the EPS
control unit. Refer to
“EPS Control Unit
Removal and
Installation (LT-A750XP/
ZK9) (Page 6C-48)”.
Replace the speed
sensor. Refer to “Speed
Sensor Removal and
Installation in Section
9C in related manual”.
Step
Action
Yes
No
“A”
(A)
I931G3630033-01
I931G3630034-01
Summary of Contents for 2009 LT-A750XK9
Page 2: ......
Page 4: ......
Page 5: ...SUPPLEMENTS L LT A750XK9 09 MODEL 10 LT A750XPK9 09 MODEL 11 ...
Page 29: ...0A 15 General Information 99565 01010 013 CD ROM Ver 13 ...
Page 57: ...0B 28 Maintenance and Lubrication 09915 40610 Oil filter wrench Page 0B 12 Page 0B 12 ...
Page 68: ...0C 11 Service Data ...
Page 310: ...1K 5 Exhaust System ...
Page 482: ...4D 6 Parking Brake ...
Page 528: ...6B 13 Steering Handlebar ...
Page 581: ......