Power Assisted Steering System: 6C-14
5
1) Turn the ignition switch ON with the EPS control unit
coupler disconnected, measure the voltage between
terminal “A” and terminal “B” at the coupler.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Voltage (
)
Normal value (“A” – “B”)
1.0 V and more
EPS control unit coupler (Vehicle harness end)
Is the voltage between “A” and “B” normal?
Go to Step 6.
• Inspect the wire
harness. (Faulty
indicator light wire)
• Indicator light is
blown.
6
1) Turn the ignition switch OFF.
2) Check for continuity between terminal “A” at the coupler
and body ground.
Special tool
(A): 09900–25008 (Multi circuit tester set)
Tester knob indication
Continuity (
)
EPS control unit coupler (Vehicle harness end)
Are there continuity between “A” and body ground?
Replace the EPS
control unit.
Inspect the wire
harness. (Faulty ground
wire)
Step
Action
Yes
No
“A”
(A)
(
ޓ
)
“B”
(A)
(–)
I931G3630010-01
“A”
(A)
I931G3630011-01
Summary of Contents for 2009 LT-A750XK9
Page 2: ......
Page 4: ......
Page 5: ...SUPPLEMENTS L LT A750XK9 09 MODEL 10 LT A750XPK9 09 MODEL 11 ...
Page 29: ...0A 15 General Information 99565 01010 013 CD ROM Ver 13 ...
Page 57: ...0B 28 Maintenance and Lubrication 09915 40610 Oil filter wrench Page 0B 12 Page 0B 12 ...
Page 68: ...0C 11 Service Data ...
Page 310: ...1K 5 Exhaust System ...
Page 482: ...4D 6 Parking Brake ...
Page 528: ...6B 13 Steering Handlebar ...
Page 581: ......