1J-8 Charging System:
• Tighten the starter cup nut (5) to the specified torque.
Tightening torque
Starter cup nut (e): 38 N·m (3.8 kgf-m, 27.5 lb-ft)
• When installing the gearshift lever arm, align the wide
spline teeth “D” with “E”. Refer to “Shift Lever
Disassembly and Assembly in Section 5A (Page 5A-
25)”.
• Apply a small quantity of thread lock to the bolts.
: Thread lock cement 99000–32050
(THREAD LOCK CEMENT 1342 or equivalent)
Regulator / Rectifier Inspection
B831G21A06005
Inspect the regulator/rectifier in the following procedures:
1) Turn the ignition switch OFF.
2) Remove the rear fender. Refer to “Rear Side Exterior Parts Removal and Installation in Section 9D (Page 9D-9)”.
3) Disconnect the regulator/rectifier coupler (1) and remove the regulator/rectifier (2).
(e)
5
I831G11A0023-05
“D”
“E”
I831G11A0024-02
I831G11A0025-02
2
1
I831G11A0026-01
Summary of Contents for 2009 LT-A750XK9
Page 2: ......
Page 4: ......
Page 5: ...SUPPLEMENTS L LT A750XK9 09 MODEL 10 LT A750XPK9 09 MODEL 11 ...
Page 29: ...0A 15 General Information 99565 01010 013 CD ROM Ver 13 ...
Page 57: ...0B 28 Maintenance and Lubrication 09915 40610 Oil filter wrench Page 0B 12 Page 0B 12 ...
Page 68: ...0C 11 Service Data ...
Page 310: ...1K 5 Exhaust System ...
Page 482: ...4D 6 Parking Brake ...
Page 528: ...6B 13 Steering Handlebar ...
Page 581: ......