1A-63 Engine General Information and Diagnosis:
Step
Action
Yes
No
1
1) Remove the left side cover. Refer to “Front Side Exterior
Parts Removal and Installation in Section 9D (Page 9D-
6)”.
2) Turn the ignition switch OFF.
3) Check the ISC valve coupler for loose or poor contacts.
If OK, then check the ISC valve lead wire continuity.
4) Disconnect the ISC valve coupler.
5) Check the continuity between terminals “A” and “34”,
terminals “B” and “4”, terminals “C” and “17”, terminals
“D” and “33”, terminals “E” and “4” and terminals “F” and
“16”.
Special tool
(A): 09900–25008 (Multi-circuit tester set)
Tester knob indication
Continuity test (
)
ECM coupler (Harness side)
Is the continuity OK?
Go to Step 2.
B/Lg, R/B, P/W, G or W/
Bl wire open.
I831G1110063-01
(A)
“17”
“34”
“A”
“B”
“C”
“4”
I831G1110064-02
(A)
“33”
“16”
“4”
“D”
“E”
“F”
I831G1110065-02
Summary of Contents for 2009 LT-A750XK9
Page 2: ......
Page 4: ......
Page 5: ...SUPPLEMENTS L LT A750XK9 09 MODEL 10 LT A750XPK9 09 MODEL 11 ...
Page 29: ...0A 15 General Information 99565 01010 013 CD ROM Ver 13 ...
Page 57: ...0B 28 Maintenance and Lubrication 09915 40610 Oil filter wrench Page 0B 12 Page 0B 12 ...
Page 68: ...0C 11 Service Data ...
Page 310: ...1K 5 Exhaust System ...
Page 482: ...4D 6 Parking Brake ...
Page 528: ...6B 13 Steering Handlebar ...
Page 581: ......