NICE3000 User Manual System typical application and adjustment
155
Mechanical parts are installed to the right position, and it won
’
t cause equipment
j)
damages or personal injuries.
Encoder inspection
2)
Encoder feedback pulse signal is an important assurance for the system to fulfill
a)
accurate control. It needs special inspection before adjusting.
Encoder installation is stable and wiring is reliable.
b)
Encoder signal wiring and strong power circuit are set in separated grooves to prevent
c)
from interference.
It would be better to introduce the encoder wiring from the encoder into the control
d)
panel. If the wiring is not long enough and need connected to the ground, the extension
part should use shielded wire and the connection with the encoder
’
s original wire
should be better welded joint with electric iron.
Encoder
’
s shielded level requires controller
’
s one terminal connect to the ground
e)
reliably.
Detailed wiring chart of encoder refers to section 3.2.3.
f)
Check power
3)
Check user
’
s power before the system is power on.
The user
’
s power voltage between each phase should be within 380V
±
15%, and the
unbalance degree should not be over 3%.
The voltage between COM and the input terminal (CN3 24V)on the main control board
a)
should be within DC24V
±
15%.
Check the specification of the main enter wire, and the capacity of switch should reach
b)
the requirements.
If the system
’
s enter voltage is over the allowable value, it will bring devastating
consequences. So attention is required in inspection. Pay attention to the positive pole and
negative pole of DC power. If there
’
s phase missing in the system enter power part, please
don
’
t operate the lift.
Connection to the ground inspection
4)
Check the resistance between grounding terminal PE and the terminal as follows,
a)
confirm whether it is infinite, if it is too small, check immediately
R
、
S
、
T and PE
U
、
V
、
W and PE
Main board 24V and PE
Motor U
、
V
、
W and PE
Encoder 15V
、
A
、
B
、
PGM and PE
f )
+、-
Bus terminal and PE
Terminal of safe circuit, door lock, inspection circuit and PE
Check the resistance between the grounding terminal of all the electric part and power
b)
Summary of Contents for MCTC-CTB-A
Page 12: ...Preface NICE3000 User Manual 12...
Page 15: ...Safety information and attention items 1...
Page 21: ...Product information 2...
Page 29: ...3 Structure of the control system and the component introduction...
Page 69: ...4 Installation and wiring...
Page 80: ...Installation and wiring NICE3000 User Manual 80...
Page 81: ...5 Function parameters tables...
Page 100: ...Function parameters tables NICE3000 User Manual 100...
Page 101: ...6 Function parameter description...
Page 153: ...7 System typical application and adjustment...
Page 172: ...System typical application and adjustment NICE3000 User Manual 172...