419050/B
65
Requirement for watertight integrity
The size, location and design of the sonar room must fulfil all the requirements to the
vessel’s watertight integrity.
In the event of a major leak, it must be possible to close all watertight hatches and/or
doors to the room to maintain the vessel stability and safety.
The physical size of the compartment must be limited, so that in the event of a major leak,
the flooding of the room will not induce instability, or cause the vessel to capsize or sink.
Ensure that all watertight decks and bulkheads are inspected periodically to verify that
there are no unprotected openings or improper penetrations that will allow progressive
flooding from the compartment, and that the watertight doors and hatches are in place
and in working order.
Ensure bilge high level alarms are arranged to provide the earliest warnings of abnormal
accumulation. The high level bilge alarms must be set as low as possible to the deck
or bilge well and positioned along the centre area of the compartment or in a location
at which the fluids will gravitate to first.
All cables leading in and out of the sonar room must be run in steel conduits. These steel
conduits must reach up and above the freeboard deck.
Size and access requirements
A well designed sonar room with a well fitted size and easy access reduces the risk of
corrosion, and simplifies maintenance. This increases system reliability.
Note
The physical size of the sonar room must be limited, so that in the event of a major leak,
the flooding of the room will not induce instability, or cause the vessel to capsize or sink.
The sonar room must be large enough to house all the system units. The room must
provide enough space to allow efficient maintenance. You must be able to keep all the
cabinet doors fully open without undue restriction to your movements.
1
The room must not be used for any other heavy machinery.
2
The room must not be unnecessarily obstructed by girders, pipes etc, which may
cause installation problems or impede maintenance.
3
The sonar room must be accessible under all conditions at sea or at a berth.
4
All doors or hatches must be designed so that the tools and equipment can be
removed without being disassembled.
5
All cables leading in and out of the sonar room must be run in steel conduits. These
steel conduits must reach up and above the freeboard deck.
Summary of Contents for SC90
Page 2: ......
Page 16: ...14 419050 B Simrad SC90 ...
Page 219: ...419050 B 217 Øverland UPC 3005 Dimensions Cable layout and interconnections ...
Page 223: ...419050 B 221 Øverland UPC 5000P Dimensions Cable layout and interconnections ...
Page 438: ...436 419050 B 427177 Transducer dock dimensions page 494 Simrad SC90 Installation Manual ...
Page 441: ...419050 B 439 Drawing file ...
Page 442: ...440 419050 B Simrad SC90 Installation Manual ...
Page 445: ...419050 B 443 Drawing file ...
Page 452: ...450 419050 B Simrad SC90 Installation Manual ...
Page 455: ...419050 B 453 Drawing file ...
Page 458: ...456 419050 B Simrad SC90 Installation Manual ...
Page 463: ...419050 B 461 Drawing file ...
Page 468: ...466 419050 B Simrad SC90 Installation Manual ...
Page 469: ...419050 B 467 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 471: ...419050 B 469 Drawing file ...
Page 473: ...419050 B 471 214043 Gate valve installation DN350 Drawing file ...
Page 475: ...419050 B 473 422915 Gate valve installation DN350 Drawing file ...
Page 477: ...419050 B 475 083045 Gate valve installation DN500 Drawing file ...
Page 479: ...419050 B 477 33414 Gate valve dimensions DN350 Drawing file ...
Page 480: ...478 419050 B Simrad SC90 Installation Manual ...
Page 481: ...419050 B 479 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 482: ...480 419050 B 33473 Gate valve dimensions DN350 Simrad SC90 Installation Manual ...
Page 483: ...419050 B 481 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 484: ...482 419050 B 33498 Gate valve dimensions DN500 Simrad SC90 Installation Manual ...
Page 485: ...419050 B 483 Drawing file ...
Page 487: ...419050 B 485 37357 Gate valve dimensions DN500 Drawing file ...
Page 488: ...486 419050 B Simrad SC90 Installation Manual ...
Page 489: ...419050 B 487 Related topics Installing the optional gate valve DN500 page 103 Drawing file ...
Page 491: ...419050 B 489 Drawing file ...
Page 494: ...492 419050 B Simrad SC90 Installation Manual ...
Page 495: ...419050 B 493 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 497: ...419050 B 495 Drawing file ...
Page 542: ... 2018Kongsberg Maritime ISBN xxx ...
Page 543: ......
Page 544: ...Simrad SC90 Fish finding sonar Installation Manual ...