419050/B
365
Result
Position
Source sensor
Talker ID
Port
Baud rate
Timeout
Requirements
Results
Position data is provided and displayed.
The relevant communication parameters are recorded.
Date and signature:
Verifying the communication with speed log
In order to operate correctly, the SC90 requires input from a speed log. The current speed
is shown in the
Status
parameter dialog box. The communication with the sensor is tested.
Prerequisites
This procedure assumes that:
• The sensor is connected to the SC90. It is switched on and in normal operation.
• The interface port is set up with the correct communication parameters.
• You are familiar with NMEA and other relevant datagram formats.
• You know how to set up the parameters for serial and local area network (LAN)
communication.
• The vessel is berthed or at sea.
• All relevant vessel drawings, installation reports and/or measurement results are
available.
• The SC90 is turned on, and it is working normally.
Neither tools nor instruments are required.
Context
In order to operate correctly, the SC90 requires input from a speed log. Without the
input from a speed log, the SC90 will neither be able to present correct navigational
information, nor compensate for vessel movements. This lack of compensation will
prevent the SC90 from providing correct echo information. In most cases a suitable
sensor is already installed on the vessel. A global positioning system (GPS) with a fitting
output format can also be used.
The communication parameters defined for
NMEA 0183
are:
•
Baud rate
: 4800 b/s
Summary of Contents for SC90
Page 2: ......
Page 16: ...14 419050 B Simrad SC90 ...
Page 219: ...419050 B 217 Øverland UPC 3005 Dimensions Cable layout and interconnections ...
Page 223: ...419050 B 221 Øverland UPC 5000P Dimensions Cable layout and interconnections ...
Page 438: ...436 419050 B 427177 Transducer dock dimensions page 494 Simrad SC90 Installation Manual ...
Page 441: ...419050 B 439 Drawing file ...
Page 442: ...440 419050 B Simrad SC90 Installation Manual ...
Page 445: ...419050 B 443 Drawing file ...
Page 452: ...450 419050 B Simrad SC90 Installation Manual ...
Page 455: ...419050 B 453 Drawing file ...
Page 458: ...456 419050 B Simrad SC90 Installation Manual ...
Page 463: ...419050 B 461 Drawing file ...
Page 468: ...466 419050 B Simrad SC90 Installation Manual ...
Page 469: ...419050 B 467 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 471: ...419050 B 469 Drawing file ...
Page 473: ...419050 B 471 214043 Gate valve installation DN350 Drawing file ...
Page 475: ...419050 B 473 422915 Gate valve installation DN350 Drawing file ...
Page 477: ...419050 B 475 083045 Gate valve installation DN500 Drawing file ...
Page 479: ...419050 B 477 33414 Gate valve dimensions DN350 Drawing file ...
Page 480: ...478 419050 B Simrad SC90 Installation Manual ...
Page 481: ...419050 B 479 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 482: ...480 419050 B 33473 Gate valve dimensions DN350 Simrad SC90 Installation Manual ...
Page 483: ...419050 B 481 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 484: ...482 419050 B 33498 Gate valve dimensions DN500 Simrad SC90 Installation Manual ...
Page 485: ...419050 B 483 Drawing file ...
Page 487: ...419050 B 485 37357 Gate valve dimensions DN500 Drawing file ...
Page 488: ...486 419050 B Simrad SC90 Installation Manual ...
Page 489: ...419050 B 487 Related topics Installing the optional gate valve DN500 page 103 Drawing file ...
Page 491: ...419050 B 489 Drawing file ...
Page 494: ...492 419050 B Simrad SC90 Installation Manual ...
Page 495: ...419050 B 493 Related topics Installing the optional gate valve DN350 page 84 Drawing file ...
Page 497: ...419050 B 495 Drawing file ...
Page 542: ... 2018Kongsberg Maritime ISBN xxx ...
Page 543: ......
Page 544: ...Simrad SC90 Fish finding sonar Installation Manual ...