1
When the main code is inputted, the LCD shows the following
display and a sub code blinks on the copy quantity display.
With the RPL on, enter the desired sub code and press the
START key to start the operation.
SIMULATION NO.1
INPUT 1 ~ 5
1. OPTICAL SYSTEM SCAN.
2. OPTICAL SYSTEM SENSOR TEST.
3. LENS TEST,
4. LENS AGING TEST.
5. LENS LOCK POSITION SETTING.
1
Mirror scan
operation
When the sub code is entered, the RPL lights up to allow
setting of the magnification ratio with the magnification ratio
key. Set the magnification ratio and press the START key, and
the mirror base and No.4/5 mirror/lens home positions will be
sensed and mirror scanning will be performed at the set ratio.
—
—
—
2
Optical system
sensor check
When the sub code is entered, the LCD shows the following
display to allow checking of the optical system sensors. (The
display is highlighted when sensed.)
—
—
—
SIMULATION NO. 1-2
LHP , MBHP , RE , MHP , DC38V
Display
Name
LHP
Lens home position sensor
MBHP
No. 4/5 mirror home position sensor
RE
Mirror motor rotary encoder output
MHP
Mirror home position sensor
DC38V
DC 38Vfor mirror motor
3
Lens, No. 4/5 mirror
operation check
When the sub code is entered, the mirror base, No. 4/5 mirror,
and the lens home positions are sensed and No. 4/5 mirror
moves one cycle of fixed magnification ratios.
—
—
—
(One cycle of fixed magnification ratios)
100%
→
50 %
→
70%
→
81%
→
86%
→
200%
→
141%
→
122%
→
115%
→
100%
4
Lens, No. 4/5 mirror
operation
check/aging
When the sub code is entered, simulation 1-3 is repeated.
—
—
—
5
Lens lock position
shift
When the sub code is entered, the lens and No. 4/5 mirror are
moved to the fixing screw position. (Used to move the copier
body.)
—
—
—
2
When the main code is inputted, the LCD shows the following
display and a sub code blinks on the copy quantity display.
With the RPL on, enter the desired sub code and press the
START key to start the operation.
SIMULATION NO. 2
INPUT 1~3
1. RADF AGING TEST.
2. RADF SENSOR TEST.
3. RADF COMPONENT OPERATION TEST.
9 – 2