2
Remove the screw in the left upper side (when viewed from the
paper exit side) of the fusing unit, and remove the upper cleaning
roller holding plate.
3
Remove the hook section of the upper cleaning roller spring C
from the fusing frame F.
4
Insert the gear section of the upper cleaning roller, and put the
bearing in the groove.
5
Hang the upper cleaning roller spring on the fusing frame F over
the bearing.
6
Fix the upper cleaning roller holding plate with the fixing screw.
(3) Pressure roller pressing
Loosen the blue nut which is under the fusing knob (at the bottom of
the fusing unit) to press the pressure roller.
6 – 5