AR-BC260 UNPACKING AND INSTALLATION 5 - 4
2) Loosen the roller knob (A), and remove the fusing unit (B).
3) Hold section A of the transfer unit and pull it out so that the
both sides of the transfer unit can be held.
4) Hold sections B and remove the transfer unit.
5) Remove the transfer belt protect sheet.
6) Remove the screw and apply a tension to the transfer belt.
7) Install the transfer unit to the machine.
5. Fusing heat roller pressing (F/R)
1) Pull the knob and open the left door.
2) Turn the pressure release lever to press.
Note: If the machine is left for one month or more, the heat roller
rubber may be deformed. In such a case, therefore, release
the pressure.
A
B
A
B