160
© Servomex Group Limited. 2020
07931001B revision 6
Figure 7-28: Installation: Large O-ring compression check
“No Go” tool to be used to check minimum
O-ring compression has not been
exceeded.
Step 1
Unscrew 4 Set Screws on the RU adjustable flange until they do not
protrude the RU adjustable flange
Step 2
Using the Gap Gauge 07931503, tighten the 4 x M16 nuts / bolts on
the receiver flange to leave an equal gap of 6.0 mm around perimeter
of the RU adjustable flange
–
see Figure 7-27
Step 3
To align using the LEDs, watch the receiver alignment LEDs on the
receiver unit as you tighten in turn each of the 4 M16 adjusting
screws.
Note:
The LEDs flash according to the direction of the adjustment.
The first and fifth LEDs will illuminate when a large change in
alignment has occurred, whereas, the second and fourth LEDs will
illuminate when a small change in alignment has occurred (either
positive or negative
–
The first and fifth LEDs will remain illuminated when the photodiode
DC level has exceeded a pre-set voltage threshold and adequate
alignment is achieved.
Summary of Contents for 07931001B
Page 2: ...Servomex Group Limited 2020 This page intentionally blank...
Page 4: ...Servomex Group Limited 2020 This page intentionally blank...
Page 12: ...viii Servomex Group Limited 2020 07931001B revision 6 This page intentionally blank...
Page 14: ...x Servomex Group Limited 2020 07931001B revision 6 This page intentionally blank...