![Servomex 07931001B Operator'S Manual Download Page 147](http://html1.mh-extra.com/html/servomex/07931001b/07931001b_operators-manual_1247057147.webp)
07931001B revision 6
© Servomex Group Limited. 2020
133
Pre-installation checks
Use this checklist to ensure that all the prerequisites have been set up before you
start to install the system:
Item
Checked
Check the services are installed (purge panel, power)
Check the process flanges are fitted correctly
Check the cable lengths are correct
Check the cables are stripped correctly
Unpack and check the components
Check the tools list
Mount the PSU or check the availability of a local 24 V supply
Table 7-2: Pre-installation check list
Installation
Make sure that the flanges on the process walls are mounted and aligned correctly
(Section 7.1).
Figure 7-8: Laser 3 Plus in-situ installation
1
Transmitter unit
2
Transmitter alignment assembly
3
Process flange and nozzle
4
Process flange
5
Receiver mounting / alignment assembly
6
Receiver unit
Summary of Contents for 07931001B
Page 2: ...Servomex Group Limited 2020 This page intentionally blank...
Page 4: ...Servomex Group Limited 2020 This page intentionally blank...
Page 12: ...viii Servomex Group Limited 2020 07931001B revision 6 This page intentionally blank...
Page 14: ...x Servomex Group Limited 2020 07931001B revision 6 This page intentionally blank...