![SELVA MARINE Blue Whale 250 EFI Service Manual Download Page 279](http://html1.mh-extra.com/html/selva-marine/blue-whale-250-efi/blue-whale-250-efi_service-manual_1237213279.webp)
6P23H11
7-24
1
2
3
4
5
6
7
8
9
Checking the hydraulic pressure
1.
Check the hydraulic pressure. Check the
internal parts if out of specification.
2.
Fully extend the PTT rams.
3.
Loosen the pipe joints
1
, and then
remove the pipe joint at end
a
.
4.
Install the special service tools.
NOTE:
Put the PTT unit in the drain pan.
5.
Connect the PTT motor leads to the bat-
tery terminals to retract the trim rams,
and then measure the hydraulic pres-
sure.
6.
Reverse the PTT motor leads between
the battery terminals to fully extend the
rams.
7.
Remove the special service tools.
8.
Install the pipe joints
1
, and then tight-
ening them to the specified torque.
9.
Connect the PTT motor leads to the bat-
tery terminals to fully retract the trim and
tilt rams.
PTT oil pressure gauge assembly
2
:
90890-06580
Ram
PTT motor lead
Battery
terminal
Down
Light green (Lg)
+
Sky blue (Sb)
-
Hydraulic pressure (down):
6.7
–
8.7 MPa (68
–
89 kgf/cm
2
)
Ram
PTT motor lead
Battery
terminal
Up
Sky blue (Sb)
+
Light green (Lg)
-
T
R
.
.
Pipe joint
1
:
15 N
·
m (1.5 kgf
·
m, 11.1 ft
·
lb)
PTT unit
Summary of Contents for Blue Whale 250 EFI
Page 1: ...Blue Whale 250 SERVICE MANUAL...
Page 97: ...6P23H11 4 14 1 2 3 4 5 6 7 8 9 1 2 3 S6P24380 2 3 Intake manifold...
Page 111: ...6P23H11 4 28 1 2 3 4 5 6 7 8 9 MEMO Fuel injector...
Page 373: ...6P23H11 i 5 1 2 3 4 5 6 7 8 9 Index MEMO...
Page 375: ......
Page 376: ......