Section 09 WIRING DIAGRAM
Subsection 02 (CONNECTOR INFORMATION)
smr2009-045-023_a
1. Pry out locking cap
smr2009-045-024_a
1. Unlock here
smr2009-045-028_a
WARNING
Before terminal installation, ensure all ter-
minals are properly crimped on wires. After
plugging connectors, ensure they are prop-
erly fastened.
BATTERY CABLE TERMINAL
Crimping
Carefully strip the wire approximately to 10 mm
(3/8 in) in length, using a wire stripping tool or
sharp blade/knife.
A32E2QA
A
A. 10 mm (3/8 in)
NOTE:
Make sure not to cut wire strands while
stripping the wire.
Install the appropriate terminal on the wire ac-
cording to the requirement. Refer to appropriate
PARTS CATALOG
.
A32E2RA
INSTALLATION OF TERMINAL
Follow the instructions provided with the
CRIMP-
ING TOOL (HEAVY GAUGE WIRE) (P/N 529 035 730)
to select the proper position of the tool.
529035730
NOTE:
Different wires require different crimping
pliers settings, so make sure to follow the instruc-
tion supplied with the tool.
526
smr2009-044
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...