Section 05 ELECTRICAL SYSTEM
Subsection 07 (GAUGE)
smr2009-036-005_a
12 PIN STEERING CONNECTOR PIN-OUT (VEHICLE SIDE)
A. Connector alignment keys
smr2009-027-011_d
TYPICAL - CONTACT COORDINATES (FRONT VIEW FB1)
7. Repair or replace wiring/connectors as re-
quired.
Continuity Test of Gauge Ground Wire
Open front cover and remove the front storage
bin, refer to
BODY
subsection.
Disconnect the 12 pin steering connector (C01-
12POS).
smr2009-036-004_a
1. Front ventilation box
2. 12 pin steering connector
Open the boarding platform, refer to
BODY
sub-
section.
Remove the RH rear storage bin, refer to
BODY
subsection.
Remove the cover from fuse box 2.
2009-027-009_a
1. Fuse box #1
2. Fuse box #2
Remove the ground bus-bar.
smr2009-027-010_e
FB2
1. Ground bus bar
Set multimeter to
selection and carry out a con-
tinuity test as per following table. Refer to the
WIRING DIAGRAM
for circuit details.
CONTINUITY TEST OF GAUGE GROUND WIRE
MULTIMETER PROBES
GAUGE
CONNECTOR
STEERING
CONNECTOR
FUSE
BOX 2
READING
Pin 11 (Black)
-
E12
Close to
0
Pin 11 (Black)
Pin 6 (Black)
-
Close to
0
-
Pin 6 (Black)
E12
Close to
0
348
smr2009-036
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...