Section 02 ENGINE
Subsection 01 (ENGINE REMOVAL AND INSTALLATION)
529 035 719
295 000 141
Trace two thin lines on alignment shaft. One
at 739 mm (29-3/32 in) and the other at 742 mm
(29-7/32 in).
smr2009-016-200_a
A. 739 mm (29-3/32 in)
B. 742 mm (29-7/32 in)
NOTE:
To perform this procedure the jet pump
and the drive shaft must be removed. Refer to
JET PUMP
and
DRIVE SYSTEM
subsections.
To verify alignment proceed as follows:
1. Remove the sealing ring and the drive shaft
boot. Refer to
DRIVE SHAFT
subsection.
2. Install the
ALIGNMENT SHAFT SUPPORT (P/N 529
035 506)
on the
ENGINE ALIGNMENT PLATE
(P/N 529 036 170)
.
529035506
ALIGNMENT SHAFT SUPPORT
529036170
ENGINE ALIGNMENT PLATE
smr2009-016-027_a
1. Engine alignment plate
2. Engine alignment support
3. Secure the tool on ride plate using jet pump
socket screws.
smr2009-016-028_a
1. Jet pump socket screws
4. Install the
ALIGNMENT SHAFT ADAPTER (P/N 529
035 719)
in engine PTO housing.
smr2009-016
21
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...