Section 06 STEERING AND PROPULSION
Subsection 02 (iBR AND VTS)
smr2009-039-002_a
1. Bailer hoses
3. Loosen the gear clamp and disconnect the wa-
ter pressure hose from the jet pump.
smr2009-039-003_a
1. Water pressure hose
4. Remove the LH storage bin, refer to the
BODY
subsection.
5. Disconnect the four hoses connected to the fit-
ting plate mounted in the iBR support plate.
smr2009-043-006_a
TYPICAL
1. Bailer hoses (x2)
2. Intercooler bleed hose
3. Pump water pressure hose
6. Remove the
FITTING PLATE
from the support
plate as described in this subsection (
this step
is only applicable to models with a metal re-
tainer on the support plate
).
7. Remove and discard the 5 hexagonal screws
securing the outer support plate to the inner
support plate.
smr2009-043-011_a
TYPICAL - MODEL WITH PLASTIC RETAINING TABS
ILLUSTRATED
1. Hexagonal screws to remove
2. Outer support plate
8. From the iBR actuator side, carefully com-
press the outer support plate tab retaining the
two support plates together using a common
screwdriver.
smr2009-037
399
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...