Section 06 STEERING AND PROPULSION
Subsection 04 (DRIVE SHAFT)
smr2009-040-003_a
1. Sealing ring
smr2009-007-001_a
TYPICAL
1. Rubber protector
10. Remove all spark plugs from engine. Refer to
IGNITION SYSTEM
.
NOTE:
Spark plug removal will ease engine rota-
tion for drive shaft removal.
11. In engine compartment, install the
DRIVE
SHAFT WRENCH (P/N 529 036 167)
on the
hexagon of sealing ring.
smr2009-007-002_a
TYPICAL
1. Drive shaft wrench
12. From rear of watercraft, install the
DRIVE
SHAFT ADAPTER (P/N 529 035 985)
on drive
shaft end.
smr2009-007-003_a
TYPICAL
1. Drive shaft adapter
13. While a coworker holds the drive shaft wrench
in the engine compartment, unscrew the drive
shaft
clockwise
(LH threads).
smr2009-040
431
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...