Section 07 BODY AND HULL
Subsection 02 (BODY)
ssi2009-003-105_a
1. Speed-Tie unit
9. Close boarding platform.
10. Tighten tapered screws securing the lock-
ing
mechanism
to
2.5 N•m ± 0.5 N•m
(22 lbf•
in
± 4 lbf•
in
).
ssi2009-003-106_a
1. Boarding platform
2. Locking mechanism
11. Install the cam trim.
11.1 Insert both cam trim retaining hooks into
locking mechanism openings.
ssi2009-003-107_a
1. Retaining hooks
11.2 Press down the cam trim against board-
ing platform.
12. Install the rear trim.
12.1 Align tabs and alignment pin with corre-
sponding openings.
ssi2009-003-109_a
1. Tabs
2. Alignment pin
12.2 Press trim in place.
13. Test Speed-Tie operation.
Speed-Tie Unit Cleaning
A minimum of maintenance is required to keep
the Speed-Tie unit and the rope in serviceable con-
dition.
Clean the locking mechanism and rope with fresh
water to remove salt, sand or other deposits.
NOTICE
Do not use a high pressure washer
to clean the Speed-Tie unit.
Let dry.
Speed-Tie Rope Replacement
1. Remove the Speed-Tie unit from the vehicle.
2. Using a small tool, remove the rope cap.
ssi2009-003-017_a
1. cap
2. Small screwdriver
3. Untie the knot and remove the button.
smr2009-042
489
Summary of Contents for GTX Limited iS 255 2009
Page 1: ......
Page 2: ...2009 Shop Manual RXT iS 255 GTX LIMITED iS 255 ...
Page 23: ...XX smr2009 011 ...
Page 27: ...4 ...
Page 29: ...6 ...
Page 33: ...10 ...
Page 37: ...14 ...
Page 47: ...24 ...
Page 53: ...30 ...
Page 59: ...36 ...
Page 81: ...58 ...
Page 107: ...84 ...
Page 171: ...148 ...
Page 195: ...172 ...
Page 209: ...186 ...
Page 235: ...212 ...
Page 275: ...252 ...
Page 303: ...280 ...
Page 319: ...296 ...
Page 335: ...312 ...
Page 381: ...358 ...
Page 395: ...372 ...
Page 449: ...426 ...
Page 489: ...466 ...
Page 551: ......
Page 552: ...NOTES ...
Page 553: ...NOTES ...
Page 554: ...2009 Sea Doo 4 TEC iTC iS Series RXT iS 255 GTX Limited iS 255 smr2009 045 001 ...
Page 555: ...IGNITION SYSTEM CHARGING SYSTEM STARTING SYSTEM smr2009 045 002 ...