Installation
- 2.12 -
PCS 200 Kit
2.10 SDB POSITIONING
The SDB (sub distribution board) should be mounted on a sheltered position and
central to the machine, in order to make the cables routing easier.
2.11 WIRING DIAGRAM
Figure 2-12 - Wiring diagram of the system with alternator
☞
The codes of the various elements are listed in the following pages. The items referred
as
5
(alternator),
8
(battery) and
10
(battery disconnect switch) are not included in
the kit.
Summary of Contents for PCS 200
Page 1: ...PCS 200 Installation Operation Maintenance ORIGINAL INSTRUCTIONS ...
Page 4: ......
Page 33: ...Installation PCS 200 Kit 2 13 Figure 2 Wiring diagram of the system without alternator ...
Page 35: ...Installation PCS 200 Kit 2 15 Figure 2 14 ECU wiring diagram ...
Page 41: ...Installation PCS 200 Kit 2 21 This page is intentionally left blank ...
Page 102: ...User Manual PCS 200 Kit 3 61 This page is intentionally left blank ...
Page 105: ...Maintenance and Troubleshooting PCS 200 Kit 4 3 4 4 SPARE PARTS ...
Page 111: ...Maintenance and Troubleshooting PCS 200 Kit 4 9 This page is intentionally left blank ...