
User Manual
PCS 200 Kit
- 3.25 -
While analyzing the data, the system estimates that 5 steps will be
necessary in order to complete the sequence. Thinking of the machine
position on the field, we will see the machine
“
lifted
”
in transport position,
with the left and right row markers
“
lifted
”
.
When the seeding job starts, the right row marker is lowered and the
machine is lowered in working position. When the end of the field is
reached, the right row marker is lifted and the machine is lifted too.
After the new positioning of the machine for the second passage at the end
of the field, the left row marker will be lowered and the machine itself will be
lowered in working position: the sequence will therefore be increased of one
step and it will be shown as follows:
As you can see, the working condition is:
•
Rows covered on the first passage: 4
Summary of Contents for PCS 200
Page 1: ...PCS 200 Installation Operation Maintenance ORIGINAL INSTRUCTIONS ...
Page 4: ......
Page 33: ...Installation PCS 200 Kit 2 13 Figure 2 Wiring diagram of the system without alternator ...
Page 35: ...Installation PCS 200 Kit 2 15 Figure 2 14 ECU wiring diagram ...
Page 41: ...Installation PCS 200 Kit 2 21 This page is intentionally left blank ...
Page 102: ...User Manual PCS 200 Kit 3 61 This page is intentionally left blank ...
Page 105: ...Maintenance and Troubleshooting PCS 200 Kit 4 3 4 4 SPARE PARTS ...
Page 111: ...Maintenance and Troubleshooting PCS 200 Kit 4 9 This page is intentionally left blank ...