Installation
- 2.16 -
PCS 200 Kit
2.9.3 SDB and power supply cables connection
Figure 15 and Figure 16 show how the connections on the two versions of the board
contained in the SDBs, respectively the SDB 12+12 (56C00646) and the SDB 3+3
(56C00651) are made.
The boards are divided into two or four dials indicated by the letters TL
1
, TR, BL, BR
corresponding to two or four cable lead-through on the SDB junction boxes.
o
The red conductors (positive) of the 05R01372 and/or 05R01373 cables
should be connected to the Wago spring terminals of the corresponding
dial.
o
The black conductors (negative) of the 05R01372 and/or 05R01373 cabling
should be connected to the Wago spring terminals in the area indicated by
the black rectangle shown in the following figure (
“
Negative
”
).
Figure 15 - SDB 12+12 connections
1
These are acronyms for Top Left, Top Right, Bottom Left, Bottom Right respectively
Summary of Contents for PCS 200
Page 1: ...PCS 200 Installation Operation Maintenance ORIGINAL INSTRUCTIONS ...
Page 4: ......
Page 33: ...Installation PCS 200 Kit 2 13 Figure 2 Wiring diagram of the system without alternator ...
Page 35: ...Installation PCS 200 Kit 2 15 Figure 2 14 ECU wiring diagram ...
Page 41: ...Installation PCS 200 Kit 2 21 This page is intentionally left blank ...
Page 102: ...User Manual PCS 200 Kit 3 61 This page is intentionally left blank ...
Page 105: ...Maintenance and Troubleshooting PCS 200 Kit 4 3 4 4 SPARE PARTS ...
Page 111: ...Maintenance and Troubleshooting PCS 200 Kit 4 9 This page is intentionally left blank ...