
uREG User Manual
107
21.
GUIDELINES FOR THE PURCHASER
The purchase order shall specify:
1.
Type of functional
APPLICATION
and number, e.g.: wind plant 0E6, power plant 1E7, etc.
(application type 0/1 specifies hardware configuration, the number 6/7 indicates the
application version).
2.
Mechanical design version:
7-slot panel flush enclosure, integrated panel;
7-slot panel surface enclosure, integrated panel;
separate panel flush installation w/ remote panel – 7, 10 or 14 slots
3.
Type of operator panel:
GV vertical panel w/ color graphic display,
GH horizontal panel w/ color graphic display,
NV vertical panel with monochromatic alphanumeric display,
no panel to be supplied.
4.
Type of 485 bus connections: wire (IF-0) / optical-fiber cable (IF-1/IF-2) / CAN-BUS (IF-4).
5.
Number of power unit modules PS-0 / PS-1 (1 or 2)
auxiliary voltage (standard PS-0 → 88 to 350 V DC, optionally PS-1 → 24 V DC).
6.
Type of digital inputs: standard 220 V DC, optionally: 24 V DC, 230 VAC, 110 V DC.
Please submit your orders to:
REGULUS Zygmunt Liszynski
ul. Piatkowska 122 / 9 – 10
PL 60-649 Poznan
Tel./Fax: +48 61 8233748
E-mail: [email protected]
www.regulus.poznan.pl
www.uREG.pl
22.
WARRANTY
A standard warranty period runs for 24 months after the date of sale.
Summary of Contents for uREG
Page 2: ...uREG User Manual 2 LogCZIP and uREG are registered trademarks of REGULUS Zygmunt Liszy ski...
Page 4: ...uREG User Manual 4...
Page 8: ...uREG User Manual 8 21 GUIDELINES FOR THE PURCHASER 107 22 WARRANTY 107...
Page 21: ...uREG User Manual 21 Drilling diagram for 10 slot enclosure installation...
Page 22: ...uREG User Manual 22 Drilling diagram for 14 slot enclosure installation...