OpAL
Oxford Instruments Plasma Technology
System Manua
l
7)
4.2.3
Connecting the services
(A)
BEFORE CONNECTING ANY OF THE SERVICES, ENSURE THAT THEY ARE
TURNED OFF. E.G. COMPRESSED AIR AND GAS SUPPLY VALVES SET TO THEIR
OFF POSITIONS AND ELECTRICAL SUPPLIES SWITCHED OFF AND LOCKED
OUT.
(B)
DO NOT RESTRICT ACCESS TO THE EMERGENCY OFF SWITCH
(EMO CONTROL) BY LOCATING CABLES AND OTHER OBSTACLES
IN FRONT OF THE SYSTEM.
IMPORTANT
NOTES
(C)
DO NOT LOCATE CABLES WHERE PERSONNEL ARE LIABLE TO WALK. OIPT
RECOMMENDS THAT CABLES ARE LOCATED IN CABLE TRUNKING /
TRENCHES.
1)
Connect the extraction collars on the system console(s) and the gas pod to the
appropriate extraction systems.
2)
Connect the rotary vane pump exhaust line.
3)
Connect the Nitrogen purge lines to the system console(s) and the rotary vane pump.
4)
Connect the compressed air supply to the system console(s) and to the gas pod.
5)
Connect the gas supplies to the gas pod (all gas supply valves closed).
6)
Connect the gas outlet line, control cable and earth cable (see Fig 4-1) from the gas
pod to the system console.
7)
Connect the cooling circuits to the system console.
8)
At the system PC, connect the monitor, keyboard and mouse, then connect the
control cable(s) from the PC to the system console.
9)
Connect the electrical supply from the safety isolation box to the system console. If it
is necessary to connect the 3-phase electrical supply cable to the power box, refer to
10)
Connect the electrical supply to the PC.
11)
Ensure that all covers and panels are fitted and attach notices to the system
indicating that the system is not ready for service.
Installation is now complete and the system is ready for commissioning by Oxford
Instruments Plasma Technology. Note that customers who have arranged to
commission the system themselves can ignore the remainder of this Section.
12)
Complete and sign the ‘System Readiness’ form QCF 89 (shipped with the system),
then fax it to OIPT who will arrange for the system to be commissioned.
Installation and Commissioning
Issue 8: July 10
Page 4-4 of 8
Printed: 14 July 2010 08:27