![Oxford Instruments OpAL System Manual Download Page 143](http://html.mh-extra.com/html/oxford-instruments/opal/opal_system-manual_1664943143.webp)
System Manual
=
lñÑçêÇ=fåëíêìãÉåíë=mä~ëã~=qÉÅÜåçäçÖó=
lé^i
RKV
léÉê~íçê=~ÇàìëíãÉåíë=
RKVKN
^ÇàìëíáåÖ=íÜÉ=k
O
=çìíäÉí=éêÉëëìêÉ=íç=íÜÉ=ëóëíÉã=
NOTE:
Refer to Section 2 for a description of the Nitrogen distribution circuit.
Depending when the system was build, the N
2
pressure to the system is controlled by a
manually controlled valve with an outlet pressure gauge (see Fig 5-9).
The N
2
outlet pressure to the system should not usually require adjustment from its factory
setting. However, if adjustment is necessary, proceed as follows.
WARNING
THIS PROCEDURE INVOLVES WORKING ON THE SYSTEM WITH COVERS REMOVED AND WITH THE
ELECTRICAL POWER ON. THEREFORE IT MUST ONLY BE CARRIED OUT BY TRAINED AND
COMPETENT PERSONNEL WHO ARE AWARE OF THE RISKS INVOLVED.
RKVKO
j~åì~ääó=ÅçåíêçääÉÇ=î~äîÉ=ïáíÜ=çìíäÉí=éêÉëëìêÉ=Ö~ìÖÉ=
1)
Remove system panels as necessary to gain access to the regulator.
Outlet connector
Outlet pressure
control knob
Outlet pressure
gauge
Fig 5-9: N
2
Pressure regulator/gauge
2)
Adjust the regulator outlet pressure control knob to set the outlet pressure to the
maximum which will not open the check valve; normally 0.5 to 0.7 bar gauge as
indicated on the regulator gauge.
NOTE
: Setting the outlet pressure too low will extend system venting times
excessively, and may compromise the purge gas flow to the turbo pump if
fitted. Setting the outlet pressure too high will open the check valve and
waste gas, but will not reduce venting times.
3)
Refit all system covers.
4)
Carry out a simple process to check that the vent sequence operates correctly.
Operating Instructions
Printed: 06 November 2007 09:42
Page 5-33 of 60
Generic (OpAL Plasma) Issue 1: Oct. 07
Summary of Contents for OpAL
Page 14: ......